Country for PR: United Kingdom
Contributor: PR Newswire Europe
Wednesday, October 09 2019 - 09:44
AsiaNet
Enertis Delivering the Highest Quality Services in Australia
MADRID, October 9, 2019, /PRNewswire-AsiaNet/--

- QA/QC On-site and In-Lab services delivered on projects in Queensland and New 
South Wales states;

- On-site Electroluminescence inspections performed on Ca. 7,800 PV modules 
within three projects, together with other testing services;

Enertis, a global consulting and engineering firm specialized in providing 
technical advisory, engineering, and quality assurance services, has been 
selected by different market actors that trusted Enertis as a Quality Control 
independent services provider at several projects located in Queensland and New 
South Wales, Australia.

As part of our role, Enertis performed On-site Inspections and In-Lab PV 
modules accredited testing services in the context of end of Defects Liability 
Period (DLP). Additionally, Enertis has been present on other projects to 
perform Damage Assessment of PV modules that due to high loads over the 
surfaces, have suffered irreversible damages not visually detectable.

Taking advantage of On-site ISO/IEC 17025 accredited testing procedures (by 
ENAC, a signatory of ILAC MRA), Enertis has performed Electroluminescence (EL) 
inspections on Ca. 7,800 PV modules, Thermographic Inspections by drone and 
hand-held cameras, and many other inspection services.

In terms of testing services to individual panels, one of the most requested is 
the EL inspection. Enertis has developed an EL analysis criterion (widely 
accepted) specifically focused on PV modules in operation and/or that suffered 
the consequences of extreme weather phenomena. For this reason, PV Developers, 
EPCs, Insurance Companies, Asset Managers relied on Enertis' expertise and 
confidence for PV modules defects analysis.

The testing/inspection capacity of Enertis is not limited to On-site 
inspections. Enertis QA/QC services cover all the value chain of a PV project, 
starting on the very early stages of Vendor's Qualification, Factory audits and 
Inspections, Advisory on MSA negotiations, BOM/production supervision and 
pre-shipment independent accredited lab testing in China.

Why Australia?

Enertis has currently 3 Headquarters plus 8 branch offices distributed around 
the globe. Nevertheless, Enertis has deployed services in more than 45 
countries, achieving a remarkable track record of +56 GW over the last 12 years.
Australia has seen its PV cumulative installed capacity doubling along the last 
two years from 6.3 GW (June 2017) to 12.9 GW (June 2019, according to APVI 
data). According to Solar Power Europe, the installation volumes between 2019 
and 2023 under the low scenario stand at 19 GW, while under the optimistic 
forecast Australia's PV additions could reach 45.7 GW. 

It is part of Enertis' strategy to be present in any country delivering the 
highest quality services. 

About Enertis (www.enertis.com)

Enertis is a global consulting and engineering firm, a leader in the renewable 
energy sector. Its mission is to guarantee the maximum profitability to its 
clients and an adequate risk management over their projects, by providing 
innovative services with high added value. Enertis has advised on renewable 
projects totaling over 56 GW in more than 45 countries. With central 
headquarters in Spain, the USA and Chile, it also has offices in Mexico, 
Central America, Argentina, Colombia, UK, South Africa and China.

Social Media:
www.linkedin.com/company/enertis-solar
@enertis

SOURCE: Enertis