Country for PR: China
Contributor: PR Newswire Asia (China)
Thursday, January 16 2020 - 21:23
AsiaNet
Solar Sustainability: Central Tower of 700 MW CSP Project by Shanghai Electric and DEWA Tops Out in Dubai
SHANGHAI, Jan. 16, 2020 /PRNewswire-AsiaNet/ --

Significant progress has been made in the Dubai 700 MW concentrated solar power 
project, announced as the world's largest single-site CSP project. On Jan 9th, 
a topping-out ceremony for the project's 222-meter central tower was held, 
welcoming representatives from Shanghai Electric - the project's general 
contractor - Dubai Electricity and Water Authority (DEWA), Noor Energy 1 and 
China Construction Third Engineering Bureau.

Experience the interactive Multichannel News Release here: 
https://www.multivu.com/players/English/8676751-shanghai-electric-dewa-dubai-solar-power-project/


Photo - https://photos.prnasia.com/prnh/20200115/2690989-3  
(caption: Celebration for Structure Capping of the Solar Receiver Tower)

"SEGC (Shanghai Electric Group Company) showed us their outstanding 
performance, finishing the concrete Solar tower according to schedule, even if 
they suffered tough challenges along the way," said Enrique Valades Nieto, Noor 
Energy 1 Construction Manager.

The 700 MW CSP project marks phase four of the Mohammed bin Rashid Al Maktoum 
Solar Park in Dubai and is a crucial part of the UAE government's "Vision 2021" 
initiative to ensure sustainable and environmentally friendly development. 

In addition to "Vision 2021", the government also launched the "Energy Strategy 
2050 Plan", which aims to increase the contribution of clean energy in the 
total energy mix from 25 per cent to 50 per cent by 2050. Once operational, the 
CSP plant will reduce Dubai's carbon footprint by 1.6 million tons per year. 

Sustainability is the focus of the project. Shanghai Electric engaged experts 
and partners to relocate wild animals and 180 mesquite trees across the 40 sq 
km site to a new wildlife park to minimize the impact of construction.

The project also aims to generate jobs for residents and is supported by an 
international team. It is estimated that as the project progresses, it will 
create around 6,000 jobs in the technology, energy management and construction 
sectors. 

About Concentrated Solar Power Systems 

Concentrated solar power systems generate solar power by using mirrors or 
lenses to concentrate a large area of sunlight onto a small area. Electricity 
is generated when the focused light is converted into to heat, which drives a 
steam turbine connected to an electrical power generator. The solar power 
collectors of the 700 MW CSP plant include both tower and tube collectors. The 
central tower is the crucial component of the plant and is used for receiving 
all the focused sunlight from the 70,000 mirrors to increase the temperature to 
more than 500 degrees celcius, and with this heat produce the steam turbine 
connected to the electrical power generator. With a total height of 267 meters, 
it is currently the world's highest thermal tower.

About Shanghai Electric

Shanghai Electric Group Company Limited (SEHK:2727, SSE:601727) is principally 
engaged in design, manufacture and distribution of electric power and 
industrial equipment. Its primary focus is on new energy, including the 
manufacture and sale of wind turbines and components and nuclear power 
equipment; efficient and clean energy business, including the manufacture and 
sale of thermal power equipment and power transmission and distribution 
equipment; industrial equipment, including the production and sale of elevators 
and motors; modern service industry, including the contracting of construction 
projects of thermal power and transmission and distribution projects, as well 
as other businesses. 

SOURCE:  Shanghai Electric

Image Attachments Links:

   Link: https://iop.asianetnews.net/view-attachment?attach-id=355718

   Caption:  Celebration for Structure Capping of the Solar Receiver Tower

Translations

Japanese

Vietnamese